Industries
For industrial and cement industry maintenance, our specialized solutions encompass both Control Room Distributed Control Systems (DCS) and Substations. In the realm of DCS systems, our experienced technicians conduct routine inspections, implement software updates, and perform hardware maintenance to ensure seamless control room operations. This translates to precise process control, real-time data monitoring, and informed decision-making, contributing to the overall efficiency of your operations. When it comes to Substations, our skilled engineers and technicians are dedicated to maintaining the integrity of your electrical infrastructure. Thorough inspections, testing, and necessary component replacements are all part of our comprehensive approach. By ensuring the reliability and safety of your substations, we play a crucial role in sustaining an uninterrupted power supply to drive the productivity and success of your industrial and cement facilities.”
Shut Down
“During the critical shut-down phase of a cement plant, our comprehensive electrical and mechanical expertise comes to the forefront. Our skilled professionals are adept at managing every aspect of this crucial period. On the electrical front, we ensure the safe disconnection and reconnection of power sources, inspect and maintain electrical panels, conduct thorough wiring checks, and test emergency backup systems. This meticulous approach guarantees a seamless resumption of operations. Simultaneously, our mechanical team takes charge of vital tasks. We perform detailed inspections and maintenance of the plant’s machinery, including the cleaning, lubrication, and calibration of mechanical components. Our experts assess the integrity of conveyor systems, optimize the functioning of kilns and crushers, and ensure the smooth operation of ventilation and dust control systems. This comprehensive mechanical approach paves the way for a successful shut-down period, minimizing downtime and maximizing the efficiency of your cement plant’s restart. By seamlessly integrating our electrical and mechanical capabilities, we contribute to a well-executed shut-down strategy that safeguards the longevity of your equipment, minimizes disruptions, and ensures a swift and efficient return to full production capacity.
Project Portfolio
2018
| Sr | Description | Client |
| 1 | Replacement of Chain for AF Bucket Elevator BE510 Works (Oasis Wear Tech Dubai) | Star Cement Industries RAK |
| 2 | Supply & Fabrication of Different type Works in UAE & Oversea Projects | Design Lab Engineering Dubai |
| 3 | Supply, Fabrication and Erection of ATS Top Loader Bunker Platform | Sharjah Cement Factory Sharjah |
2016
| Sr | Description | Client |
| 4 | Lighting & False Ceiling Works in CCR, Office & MV Switchgear Room | Fujairah Cement Industries Fujairah |
2015
| Sr | Description | Client |
| 5 | MV Switchgear Modification Works at HV Sub Station Room | Fujairah Cement Industries Fujairah |
| 6 | 33 KV GIS Sub Station Works including the Testing Unit – 01 Main Sub Station | Fujairah Cement Industries Fujairah |
| 7 | MV Cable Works at Thermal Power Plant | Fujairah Cement Industries Fujairah |
| 8 | Supply & Installation of Lighting & Earthing Works at New Built Clinker Shed | Fujairah Cement Industries Fujairah |
| 9 | 11 KV Cable Works at Saja Industrial Area Sharjah | GECO Mechanical & Electrical Sharjah SEWA |
| 10 | Complete Earthing Works at Wast Heat Recovery Power Plant (WHR) at Dibba Fujairah | Fujairah Cement Industries Fujairah |
| 11 | Civil & Electrical Works in live Cable Tunnel in Thermal Power Plant Area | Fujairah Cement Industries Fujairah |
| 12 | 11 KV OHL Repair & Maitenance Work at Madam & Sily Area | GECO Mechanical & Electrical Sharjah FEWA |
| 13 | 33 KV Cables Works from Unit – 01 to Unit – 02 Sub station | Fujairah Cement Industries Fujairah |
| 14 | Electrical Cable Tunnel Works at Thermal Power Plant Area | Fujairah Cement Industries Fujairah |
| 15 | Supply & Installation of Emergency Exit Door & Hand Rail Works at HV Sub Station Room | Fujairah Cement Industries Fujairah |
2014 / 2015
| Sr | Description | Client |
| 16 | DCS upgradation 4500 KPT Module Change ./ Wiring change | Fujairah Cement Industries Fujairah |
2014
| Sr | Description | Client |
| 17 | Supply Of DCS Material & Equipment for DCS Up – Gradation Project Phase – 2 & 3 | Fujairah Cement Industries Fujairah |
| 18 | Installation, Testing & Commissioning Of DCS Up – Gradation Project Phase – 2 & 3 | Fujairah Cement Industries Fujairah |
| 19 | Supply, Installation Of Electrical & Instrument Works for Weigh Feeder Cement Mill 1 & 2 | Fujairah Cement Industries Fujairah |
| 20 | Supply, Installation Of Fiber Optical Network Works for DCS Up – Gradation Project Phase 2 & 3 | Fujairah Cement Industries Fujairah |
| 21 | Supply Of DCS Material & Equipment for DCS Up – Gradation Project Phase – 1 | Fujairah Cement Industries Fujairah |
| 22 | Supply, Installation Of Fiber Optical Network Works for DCS Up – Gradation Project Phase 2 & 3 | Fujairah Cement Industries Fujairah |
| 23 | Emergency Instrument Cable Repair Works at Pre-Heater U – 2 | Fujairah Cement Industries Fujairah |
| 24 | Installation, Testing & Commissioning Of DCS Up – Gradation Project | Fujairah Cement Industries Fujairah |
| 25 | Electrical & Instrumentation Works in Annual Maintenance Shut Down | Fujairah Cement Industries Fujairah |
| 26 | Dismantling Of Existing DCS ABB Equipment in CCR -1 for DCS Up – Gradation Project Phase – 1 | Fujairah Cement Industries Fujairah |
| 27 | Engineering, Supply, Installation Of Electrical & Instrument Works for Clinker Transport Project Phase -1 | Fujairah Cement Industries Fujairah |
2013
| Sr | Description | Client |
| 28 | Supply & Installation of Power Cable network at Demand Shipyard Hamrayah Free Zone Sharjah | Bridgeway Electromechanical LLC Dubai |
| 29 | Supply & Installation Electrical & Instrument work for Bucket Elevator feed to Raw Mill Unit – 1 | Fujairah Cement Industries Fujairah |
2012 / 2013
| Sr | Description | Client |
| 30 | Supply & Installation Of MEP work for Arcellormittal DSTC FZCO Dubai | ARJ Engineering LLC Dubai |
| 31 | Supply & Installation Of CCTV System for Arcellormittal DSTC FZCO Dubai | ARJ Engineering LLC Dubai |
| 32 | Supply & Installation Of Fire Alarm System for Arcellormittal DSTC FZCO Dubai | ARJ Engineering LLC Dubai |
| 33 | Supply & Installation Of Central Battary System for Arcellormittal DSTC FZCO Dubai | ARJ Engineering LLC Dubai |
| 34 | Supply & Installation Of Shed Lighting System for Arcellormittal DSTC FZCO Dubai | ARJ Engineering LLC Dubai |
| 35 | Supply & Installation Of Access Control with Biomatric System for Arcellormittal DSTC FZCO Dubai | ARJ Engineering LLC Dubai |
2012
| Sr | Description | Client |
| 36 | Supply & Installation Of Electrical & Instrumentation work for Venting System at Raw Mill Unit –1 | Fujairah Cement Industries Fujairah |
| 37 | Trench Excavation, Installation of MV / LV Cable Network for Jumairah Park Dubai | SCANTEC International LLC Dubai NOURAL |
| 38 | Installation of Electrical & Plumbing Works for Ruwais Housing Complex Expansion –Phase III, Abu Dhabi for ADNOC | RAS Engineering LLC Dubai ADNOC |
2011 / 2012
| Sr | Description | Client |
| 39 | Supply & Installation Of Electrical works for 29 Villas Residential Complex at Season community Jumairah Village Dubai | ARJ Engineering LLC Dubai |
| 40 | Supply & Installation Of Fire Alarm System for 29 Villas Residential Complex at Season community Jumairah Village Dubai | ARJ Engineering LLC Dubai |
| 41 | Supply & Installation Of Central Battery System for 29 Villas Residential Complex at Season community Jumairah Village Dubai | ARJ Engineering LLC Dubai |
| 42 | 2 X 20 MW coal fire thermal power plant E&I Mech job | Fujairah Cement Industries Fujairah |
2011
| Sr | Description | Client |
| 43 | Installation Of Electrical & Instrumentation work for HVAC System at Safeer Mall –Fujairah | Precold Inernational LLC Shairjah |
| 44 | Supply & Installation Of DCS & Instrumentation Interlocking System of Unit – 1 & Unit – 2 | Fujairah Cement Industries Fujairah |
| 45 | Installation, Testing & Commissioning Of Fire Alarm Systems in Newly Built Power Plant | Fujairah Cement Industries Fujairah |
| 46 | Installation Of Electrical & Instrumentation works for Clinker Transportation and Storage | Fujairah Cement Industries Fujairah |
2010 / 2011
| Sr | Description | Client |
| 47 | 7500 KPT Clinker Production E&I Mech job | Fujairah Cement Industries Fujairah |
2010
| Sr | Description | Client |
| 48 | Electrical Networking for water spray system at Crusher U – 2 | Fujairah Cement Industries Fujairah |
| 49 | Core Cutting Works in Cyclone Stage 3 & 4 at Pre – Heater U – 2 | Fujairah Cement Industries Fujairah |
| 50 | Testing Of LV Switch Board in Main Station DIBVER | Fujairah Cement Industries Fujairah |
| 51 | Installation & Wiring Works for Local Control Station for Bucket Elevators Feeding to Raw Mill Silo & Pre-Heater DIBVER | Fujairah Cement Industries Fujairah |
| 52 | Cabling & Connection Works for Aeration Blower at Raw Mill Silo at DIBVER U – 2 | Fujairah Cement Industries Fujairah |
| 53 | Installation of DC Battery Charger System | Fujairah Cement Industries Fujairah |
| 54 | Modification Works in New Cement Plant 7500 TPD U – 2 | Fujairah Cement Industries Fujairah |
| 55 | Engineering, Supply, Installation, Testing & Commisioning Works for Water Treatment Systems at DIBGEN Project | Fujairah Cement Industries Fujairah |