Highlight Projects

ORC/WHR Power Plant

Project: 10 MW-e ORC/WHR POWER PLANT (Emirates Lafarge Cement)

Country: Fujairah – United Arab Emirates

Client: ENGIE SOLUTION MIDDLE EAST

Design & Supplied By: TURBODEEN ITALY – SINOMA CHINA

Year: 2023 – 2025

Status: Ongoing

SCOPE OF WORK

The Procurement, Construction (PC) and Very high Power production facility including the following major processing equipment:

  • Erection of AQC & SP Boiler
  • Erection of ACC & ORC
  • Complete CIVIL Works
  • Supply, Fabrication & Erection follow Gases – inlet/out Duct
  • Fabrication & Erection of Piping Thermal Oil – Cyclopenten & Lubrication Circuits
  • Erection of Electrical & Instrumentation Works

Petrochemical Industries

Project: IBI Agro Chemical

Country: Ras Al Khaima – United Arab Emirates

Client: Integra Benefit Investment LLC

Design & Supplied By: TONGLY CHINA & BUILDZONE LLC

Year: 2020 – 2021

Status: Completed

SCOPE OF WORK

Construction and Erection of complete Plant Agro Chemical production facility including the following major equipment:

  • Erection of Mechanical & Electrical Equiment
  • Erection of Built Convoyers
  • Supply, Fabrication & Erection follow Gases outlet Chimny
  • Erection of Electrical & Instrumentation Works

ORC/WHR Power Plant

Project: 2.9 MW-e ORC/WHR POWER PLANT (Pioneer Cement Industries)

Country: Ras Al Khaima – United Arab Emirates

Client: Pioneer Cement Industries

Design & Supplied By: First ESCO India, AZOLIS France

Year: 2018 – 2019

Status: Completed

SCOPE OF WORK

The Procurement, Construction (PC) and Very high Power production facility including the following major processing equipment:

  • Erection of AQC Boiler
  • Erection of ACC & ORC
  • Complete CIVIL Works
  • Supply, Fabrication & Erection follow Gases – inlet/out Duct
  • Fabrication & Erection of Piping Thermal Oil – Cyclopenten & Lubrication Circuits
  • Erection of Electrical & Instrumentation Works

DCS & Power Upgradation

Project: Power Up-Gradation (Fujairah Cement Industries)

Country: Fujairah – United Arab Emirates

Client: Fujairah Cement Industries

Design & Supplied By: SCIENCETECHNIC LLC

Year: 2014 – 2015

Status: Completed

SCOPE OF WORK

The Procurement, Construction Power Up-Gradtion including the following major processing equipment:

  • ERECTION OF 33 Kv GIS, 11 kv SWITCHGEAR
  • UP GRADATION OF DCS, PLC & SCADA SYSTEM
  • INSUSTRIAL LIGHTING, EARTHING & LIGHTENING SYSTEM
  • EMERGENACY REPAIR WORKS OD 6.6 Kv CABLE NETWORK UNIT-1 LINE

11 KV Overhead Line Upgradation (FEWA)

Project: 11 Kv Up-Gradtion OVERHEAD LINE
(Al-Dhaid, Kudhairah, Madam & Ras Al Khaima)

Country: Northern Emirates – United Arab Emirates

Client: Etihad Water & Electricity (FEWA)

Design & Supplied By: GECO

Year: 2013

Status: Completed

SCOPE OF WORK

Construction System Perposal Up-Gradation 11 Kv overhead line in Northern Emirates including the following Area in United Arab Emirates:

  • ERECTION OF 11 Kv OVERHEAD LINE IN AL DHAIT SHARJAH FOR FEWA 2.5 KM
  • ERECTION OF 11 Kv OVERHEAD LINE IN AL KUDHAIRAH RAS AL KHAIMA FOR FEWA 1.8 KM
  • ERECTION OF 11 Kv OVERHEAD LINE IN MADAM RAS AL KHAIMA FOR FEWA 2.1 KM
  • ERECTION OF 11 Kv OVERHEAD LINE IN BAREIRAT RAS AL KHAIMA FOR FEWA 3.4 KM

2X20 MW COAL FIRED POWER PLANT

Project: 2 X 20 MW-e COAL FIRED POWER PLANT (FUJAIRAH CEMENT INDUSTRIES)

Country: Dibba Fujariah – United Arab Emirates

Client: Fujairah cement Industries

Design & Supplied By: INDUR (pvt) Ltd India

Year: 2011 – 2012

Status: Completed

SCOPE OF WORK

The Procurement, Construction (PC) and Very high Power production facility including the following major processing equipment:

  • INSTALLATION & TESTING COMISSIONING OF E & I SYSTEM FOR BOILERS
  • INSTALLATION & TESTING-COMISSIONING OF E & I SYSTEM FOR TURBINE & GENERATOR BUILDING
  • INSTALLATION & TESTING-COMISSIONING OF E & I SYSTEM FOR COAL STORAGE & TRANSPORT
  • INSTALLATION & TESTING COMISSIONING OF 11 KV SWITCGEAR ALONGE ASSOCIATE SYSTEM

7500 TPD CEMENT PRODUCTION

Project: 7500 TPD CEMENT PRODUCTION
(FUJAIRAH CEMENT INDUSTRIES)

Country: Dibba Fujariah – United Arab Emirates

Client: Fujairah cement Industries

Design & Supplied By: POLYSIOUS Germany

Year: 2010

Status: Completed

SCOPE OF WORK

Construction of 7500 TPD Cement Production Facilities including the following major processing equipment:

  • INSTALLATION & TESTING COMISSIONING OF E & I CRUSHER & LIMESTOLE TRANSPORT
  • INSTALLATION & TESTING COMISSIONING OF E & I RAW MILL & PREHEATER
  • INSTALLATION & TESTING-COMISSIONING OF E & I KILN & COOLER
  • INSTALLATION & TESTING COMISSIONING
    OF 33 Kv, 11 kv & LOW VOLTAGE SUB-STATIONS