For industrial and cement industry maintenance, our specialized solutions encompass both Control Room Distributed Control Systems (DCS) and Substations. In the realm of DCS systems, our experienced technicians conduct routine inspections, implement software updates, and perform hardware maintenance to ensure seamless control room operations. This translates to precise process control, real-time data monitoring, and informed decision-making, contributing to the overall efficiency of your operations. When it comes to Substations, our skilled engineers and technicians are dedicated to maintaining the integrity of your electrical infrastructure. Thorough inspections, testing, and necessary component replacements are all part of our comprehensive approach. By ensuring the reliability and safety of your substations, we play a crucial role in sustaining an uninterrupted power supply to drive the productivity and success of your industrial and cement facilities.”

Shut Down
“During the critical shut-down phase of a cement plant, our comprehensive electrical and mechanical expertise comes to the forefront. Our skilled professionals are adept at managing every aspect of this crucial period. On the electrical front, we ensure the safe disconnection and reconnection of power sources, inspect and maintain electrical panels, conduct thorough wiring checks, and test emergency backup systems. This meticulous approach guarantees a seamless resumption of operations. Simultaneously, our mechanical team takes charge of vital tasks. We perform detailed inspections and maintenance of the plant’s machinery, including the cleaning, lubrication, and calibration of mechanical components. Our experts assess the integrity of conveyor systems, optimize the functioning of kilns and crushers, and ensure the smooth operation of ventilation and dust control systems. This comprehensive mechanical approach paves the way for a successful shut-down period, minimizing downtime and maximizing the efficiency of your cement plant’s restart. By seamlessly integrating our electrical and mechanical capabilities, we contribute to a well-executed shut-down strategy that safeguards the longevity of your equipment, minimizes disruptions, and ensures a swift and efficient return to full production capacity.

Project Portfolio

2018
SrDescriptionClient
1Replacement of Chain for AF Bucket Elevator BE510 Works (Oasis Wear Tech Dubai)Star Cement Industries RAK
2Supply & Fabrication of Different type Works in UAE & Oversea ProjectsDesign Lab Engineering Dubai
3Supply, Fabrication and Erection of ATS Top Loader Bunker PlatformSharjah Cement Factory Sharjah

 

SrDescriptionClient
4Lighting & False Ceiling Works in CCR, Office & MV Switchgear RoomFujairah Cement Industries Fujairah

 

SrDescriptionClient
5MV Switchgear Modification Works at HV Sub Station RoomFujairah Cement Industries Fujairah
633 KV GIS Sub Station Works including the Testing Unit – 01 Main Sub StationFujairah Cement Industries Fujairah
7MV Cable Works at Thermal Power PlantFujairah Cement Industries Fujairah
8Supply & Installation of Lighting & Earthing Works at New Built Clinker ShedFujairah Cement Industries Fujairah
911 KV Cable Works at Saja Industrial Area SharjahGECO Mechanical & Electrical Sharjah SEWA
10Complete Earthing Works at Wast Heat Recovery Power Plant (WHR) at Dibba FujairahFujairah Cement Industries Fujairah
11Civil & Electrical Works in live Cable Tunnel in Thermal Power Plant AreaFujairah Cement Industries Fujairah
1211 KV OHL Repair & Maitenance Work at Madam & Sily AreaGECO Mechanical & Electrical Sharjah FEWA
1333 KV Cables Works from Unit – 01 to Unit – 02 Sub stationFujairah Cement Industries Fujairah
14Electrical Cable Tunnel Works at Thermal Power Plant AreaFujairah Cement Industries Fujairah
15Supply & Installation of Emergency Exit Door & Hand Rail Works at HV Sub Station RoomFujairah Cement Industries Fujairah
SrDescriptionClient
16DCS upgradation 4500 KPT Module Change ./ Wiring changeFujairah Cement Industries Fujairah

 

SrDescriptionClient
17Supply Of DCS Material & Equipment for DCS Up – Gradation Project Phase – 2 & 3Fujairah Cement Industries Fujairah
18Installation, Testing & Commissioning Of DCS Up – Gradation Project Phase – 2 & 3Fujairah Cement Industries Fujairah
19Supply, Installation Of Electrical & Instrument Works for Weigh Feeder Cement Mill 1 & 2Fujairah Cement Industries Fujairah
20Supply, Installation Of Fiber Optical Network Works for DCS Up – Gradation Project Phase 2 & 3Fujairah Cement Industries Fujairah
21Supply Of DCS Material & Equipment for DCS Up – Gradation Project Phase – 1Fujairah Cement Industries Fujairah
22Supply, Installation Of Fiber Optical Network Works for DCS Up – Gradation Project Phase 2 & 3Fujairah Cement Industries Fujairah
23Emergency Instrument Cable Repair Works at Pre-Heater U – 2Fujairah Cement Industries Fujairah
24Installation, Testing & Commissioning Of DCS Up – Gradation ProjectFujairah Cement Industries Fujairah
25Electrical & Instrumentation Works in Annual Maintenance Shut DownFujairah Cement Industries Fujairah
26Dismantling Of Existing DCS ABB Equipment in CCR -1 for DCS Up – Gradation Project Phase – 1Fujairah Cement Industries Fujairah
27Engineering, Supply, Installation Of Electrical & Instrument Works for Clinker Transport Project Phase -1Fujairah Cement Industries Fujairah

 

SrDescriptionClient
28Supply & Installation of Power Cable network at Demand Shipyard Hamrayah Free Zone SharjahBridgeway Electromechanical LLC Dubai
29Supply & Installation Electrical & Instrument work for Bucket Elevator feed to Raw Mill Unit – 1Fujairah Cement Industries Fujairah

 

SrDescriptionClient
30Supply & Installation Of MEP work for Arcellormittal DSTC FZCO DubaiARJ Engineering LLC Dubai
31Supply & Installation Of CCTV System for Arcellormittal DSTC FZCO DubaiARJ Engineering LLC Dubai
32Supply & Installation Of Fire Alarm System for Arcellormittal DSTC FZCO DubaiARJ Engineering LLC Dubai
33Supply & Installation Of Central Battary System for Arcellormittal DSTC FZCO DubaiARJ Engineering LLC Dubai
34Supply & Installation Of Shed Lighting System for Arcellormittal DSTC FZCO DubaiARJ Engineering LLC Dubai
35Supply & Installation Of Access Control with Biomatric System for Arcellormittal DSTC FZCO DubaiARJ Engineering LLC Dubai

 

SrDescriptionClient
36Supply & Installation Of Electrical & Instrumentation work for Venting System at Raw Mill Unit –1Fujairah Cement Industries Fujairah
37Trench Excavation, Installation of MV / LV Cable Network for Jumairah Park DubaiSCANTEC International LLC Dubai NOURAL
38Installation of Electrical & Plumbing Works for Ruwais Housing Complex Expansion –Phase III, Abu Dhabi for ADNOCRAS Engineering LLC Dubai ADNOC

 

SrDescriptionClient
39Supply & Installation Of Electrical works for 29 Villas Residential Complex at Season community Jumairah Village DubaiARJ Engineering LLC Dubai
40Supply & Installation Of Fire Alarm System for 29 Villas Residential Complex at Season community Jumairah Village DubaiARJ Engineering LLC Dubai
41Supply & Installation Of Central Battery System for 29 Villas Residential Complex at Season community Jumairah Village DubaiARJ Engineering LLC Dubai
422 X 20 MW coal fire thermal power plant E&I Mech jobFujairah Cement Industries Fujairah

 

SrDescriptionClient
43Installation Of Electrical & Instrumentation work for HVAC System at Safeer Mall –FujairahPrecold Inernational LLC Shairjah
44Supply & Installation Of DCS & Instrumentation Interlocking System of Unit – 1 & Unit – 2Fujairah Cement Industries Fujairah
45Installation, Testing & Commissioning Of Fire Alarm Systems in Newly Built Power PlantFujairah Cement Industries Fujairah
46Installation Of Electrical & Instrumentation works for Clinker Transportation and StorageFujairah Cement Industries Fujairah

 

SrDescriptionClient
477500 KPT Clinker Production E&I Mech jobFujairah Cement Industries Fujairah

 

SrDescriptionClient
48Electrical Networking for water spray system at Crusher U – 2Fujairah Cement Industries Fujairah
49Core Cutting Works in Cyclone Stage 3 & 4 at Pre – Heater U – 2Fujairah Cement Industries Fujairah
50Testing Of LV Switch Board in Main Station DIBVERFujairah Cement Industries Fujairah
51Installation & Wiring Works for Local Control Station for Bucket Elevators Feeding to Raw Mill Silo & Pre-Heater DIBVERFujairah Cement Industries Fujairah
52Cabling & Connection Works for Aeration Blower at Raw Mill Silo at DIBVER U – 2Fujairah Cement Industries Fujairah
53Installation of DC Battery Charger SystemFujairah Cement Industries Fujairah
54Modification Works in New Cement Plant 7500 TPD U – 2Fujairah Cement Industries Fujairah
55Engineering, Supply, Installation, Testing & Commisioning Works for Water Treatment Systems at DIBGEN ProjectFujairah Cement Industries Fujairah