Power Transmission

“Experience cutting-edge solutions in 33 KV and Transmission Line Installation across the UAE. Our dedicated teams of professionals specialize in the design, construction, and maintenance of robust transmission networks, ensuring seamless energy flow and stability. Leveraging the latest technologies and industry best practices, we create efficient and reliable connections that empower industries, communities, and sustainable growth. Navigate the evolving energy landscape with confidence through our comprehensive 33 KV and Transmission Line Installation services in the UAE. Our experienced engineers and technicians bring technical expertise and local insights to every project, ensuring efficient power distribution and system resilience. From urban centers to remote regions, we contribute to driving progress and shaping a connected, sustainable energy future for the UAE and beyond.”

Project Portfolio

2014
SrDescriptionClient
1Emergency Repair Works Of 6.6 KV Cable Network U – 2Fujairah Cement Industries Fujairah
2Ground Fault Tracing & Rectification Works for 2.5 MVA Transformers U – 2Fujairah Cement Industries Fujairah
3Modification & Rerouting Works Of 11 KV Over Head Line in Filli AreaGECO Mechanical & Electrical Sharjah SEWA

 

SrDescriptionClient
11Shut Down Works Of 11 KV Over Head Line in RAK AreaGECO Mechanical & Electrical Sharjah SEWA
4Installation of work 11 – KV Overhead Line for FEWA Dhaid areaGECO Mechanical & Electrical Sharjah FEWA
5Installation of work 11 – KV Overhead Line for FEWA Kudhairah areaGECO Mechanical & Electrical Sharjah SEWA
6Installation of work 11 – KV Overhead Line for FEWA Madam areaGECO Mechanical & Electrical Sharjah SEWA
7Installation of work 11 – KV Overhead Line for FEWA RAK areaGECO Mechanical & Electrical Sharjah SEWA

 

SrDescriptionClient
8Installation of 132/33 KV Sub Station in Jumairah Park Cable Sports & ClampsSCANTEC International LLC Dubai NOURAL

 

SrDescriptionClient
9Trench Excavation, Existing 33 – KV Cables Removal, Re – Routing & Back Filling, Jointing & Termination Of Same 33 KV Cables in Cement Mill # 1, 2 & 3Fujairah Cement Industries Fujairah

 

SrDescriptionClient
10Testing & Commissioning Works Of LV Switch Board in Clinker Sub – Station U – 2Fujairah Cement Industries Fujairah
11Repair, Re – Routing & Jointing Works for LV Cables in Emergency Works U – 1Fujairah Cement Industries Fujairah
12Installation Of SF6 C.B & Gas Filling in 33 KV GIS Switch Gear (ABB) in Main Station U – 2Fujairah Cement Industries Fujairah
13Emergency Repair Works for Instruments & Electrical Cables at Annual Shut Down U – 1Fujairah Cement Industries Fujairah
14BDV & Oil Filtration Of 25 MVA, 2000 KVA, 1500 KVA, 1600 KVA, 1000 KVA Transformers at DIBVER ProjectFujairah Cement Industries Fujairah