Shut Down Projects

Sr No

Project Descriptions

Client

Year

1Complete Raw Mill Shell Liner ReplacementPioneer Cement Industries RAK2017
2Complete Worn out 1st Chamber ReplacementPioneer Cement Industries RAK2017
3Complete Raw Mill O–Sepa Outlet Transition ReplacementPioneer Cement Industries RAK2017
4Complete Raw Mill O–Sepa Outlet Guide vanes ReplacementPioneer Cement Industries RAK2017
5Complete Cement Mill Diaphragm Liner ReplacementPioneer Cement Industries RAK2017
6Complete Cement Mill Inlet & Outlet Slid Shoe ReplacementPioneer Cement Industries RAK2017
7Complete Replacement of Cooling Tower FillsPioneer Cement Industries RAK2017
8Installation of By passline from Cooling Tower to SumpPioneer Cement Industries RAK2017
9Recirculation fan bearings replacementPioneer Cement Industries RAK2017
10Cleaning of Mill Discharge Bucket Elevator (561BE1)Jabel Ali Cement Factory Dubai2017
11Replacement of Separator DuctJabel Ali Cement Factory Dubai2017
12Main Bag Filter Pulsing Pipes and flanges replacementJabel Ali Cement Factory Dubai2017
13Separator Gear Box bevel pinion shaft with bevel gear and seals replacement workJabel Ali Cement Factory Dubai2017
14Charging of Grinding MediaJabel Ali Cement Factory Dubai2017
15Replacement of New Ring Gear of 2nd stage SEISA Gear Unit of Mill DriveJabel Ali Cement Factory Dubai2017
16KILN BSI Silo Air Distribution Box and Pipe Line CleaningSharjah Cement Factory Sharjah2018
17Replacement of Recliner Scraper ChainSharjah Cement Factory Sharjah2018
18Replacement of Compressor Air Line at Shredder Plant with all fittingsSharjah Cement Factory Sharjah2018
19KILN BSI Silo Internal Repair (Replacement of fabric)Star Cement Industries Oasis Wear Tech2018
20Recliner 122BC110 Discharge Chute ReplacementStar Cement Industries Oasis Wear Tech2018
21Stacker Feed Chute ReplacementCEMEX Cement Oasis Wear Tech Dubai2018
22Repair and Replacement of TAD Slide and HOODCEMEX Cement Oasis Wear Tech Dubai2018
23Replacement of Belt Conveyor Pulley 10 Nos. Removal & InstallationCEMEX Cement Oasis Wear Tech Dubai2018
24Replacement of Rubber Back Support of 362 nos. Buckets for Bucket ElevatorCEMEX Cement Oasis Wear Tech Dubai2018
25Replacement of Movable Law. Weight 2450 Kg, in 112AJC100 Jaw CrusherCEMEX Cement Oasis Wear Tech Dubai2018
26Replace Bearing in 131ARE300. Circular Reclaimer Rake Car Chain Drive and Tension ShaftCEMEX Cement Oasis Wear Tech Dubai2018
27Pullout Dismantles, Replace bearing and damaged part, assemble and install back the 1st Pully in 133AST200. Additive Stacker through off CarEmirate Cement (LAFARGE) Oasis Wear Tech Dubai2018
28Replacement of ROD, material C35, unit weight 7 Kg; Qty 78 Nos / Set in 311AAW150. Mix weight feeder ROD GateEmirate Cement (LAFARGE) Oasis Wear Tech Dubai2018
29Replacement of Bearings, Chain Sprocket Segments in 311AAW150. Mix weigh Feeder Drive and Driven ShaftEmirate Cement (LAFARGE) Oasis Wear Tech Dubai2018
30Replacement of Roller Chain including the Guid Rails by Sq bar 30 x 30 mm, Length 5000 mm, Material St 37, Qty – 2 in 311AAW150. Mix weigh FeederEmirate Cement (LAFARGE) Oasis Wear Tech Dubai2018
31Replacement of Bearing in Drive Pully. Size dia 800 x 1150 mm, dwg 3.0927878 in 311ABCG620 Belt ConveyorEmirate Cement (LAFARGE) Oasis Wear Tech Dubai2018
32Replacement of Bolt HM 48 h 13 x 240/90, with nut HM 48, in 321A_FN400. Raw Mill Fan Shaft Centre HubEmirate Cement (LAFARGE) Oasis Wear Tech Dubai2018
33Belt conveyor tail end drum dismantling and assembly work with bearing replacementEmirate Cement (LAFARGE) Oasis Wear Tech Dubai2018
34Pullout Dismantle and install back the gear box. Model, R 3 / 320 UP2A/40.7 make RossiJabel Ali Cement Factory Dubai2018
35VRM suction duct replacement work (Only fitting works)Jabel Ali Cement Factory Dubai2018
36Pre-arrangement of holding the existing top & bottom M.S duct before removal existing duct. Size : 2250 mmJabel Ali Cement Factory Dubai2018
37Charging of Grinding Media (1st Stage Chamber 80 Ton + 2nd Stage Chamber 190 Ton)Jabel Ali Cement Factory Dubai2018
38Cement Mill-2 First Chamber Wornout Liner ReplacementPioneer Cement Industries RAK2019
39DDPC-1 Discharge By-pass Pipe line Rotation of DDPC-1 Discharge By-pass Pipe line by 180 degree Flange joints to be opened and the pipes to be rotatedPioneer Cement Industries RAK2019
40Replacement of Chain for AF Bucket Elevator BE510Star Cement Industries Oasis Wear Tech2019
41kiln – 1 BSI Silo Air Distribution box and Pipeline cleaning workSharjah Cement Factory Sharjah2019
42kiln – 1 BSI Silo INTERNAL REPAIR , replacement of existing airside fabric with new fabricSharjah Cement Factory Sharjah2019
43Raw Mill-1 WORNOUT LCD LINERS replacement, as per drawing No: W5/5116/38Pioneer Cement Industries RAK2020
44Cement Mill – 2 VENT BAG HOUSE WORNOUT I/L DUCT with transition piece replacementPioneer Cement Industries RAK2020
45Separator Gear Box bevel pinion shaft with bevel gear and seals replacement workJabel Ali Cement Factory Dubai2020
46Main Bag Filter Pulsing Pipes and flanges replacement work Air Receiver Pipe Line to Main Bag Filter workJabel Ali Cement Factory Dubai2020
47Replacement of New Ring Gear of 2nd stage SEISA Gear Unit of Mill DriveJabel Ali Cement Factory Dubai2020
48Cement Silo and Airslide Maintenance WorksSharjah Cement Factory2020
49Dismantling & Erection of Surge hopper – Siltstone Crusher Surge hopper bottom portion and discharge chute need to be replacedSharjah Cement Factory2020
50Raw Mill-2 WORNOUT LCD LINERS replacement, as per drawing No: W5/5116/3Pioneer Cement Industries RAK2021
51RM–2 DRYING DIAPHRAM Liner ReplacementPioneer Cement Industries RAK2021
52SUPPLY OF TECHNICAL WORK FORCE FOR SHUTDOWNStar Cement Industries RAK2021
53Repair & replacement of Plate in Preheater(Falcon Synergy Engineering) Star Cement Industries RAK2023
54Raw Mill-2 WORNOUT LCD LINERS replacement, as per drawingLafarge Emirates Cement Fujairah2025